East Rocks Road Work, Plan For Detour
State Senator Bob Duff wants you to know that East Rocks Rd. has bridgework being done.
from a press release:
Plan for Detours: Portion of East Rocks Road to be Closed
The Connecticut Department of Transportation recently announced that East Rocks Road between Granite Drive and Ox Yoke Lane in Norwalk will be closed to thru traffic beginning on March 22, 2010.
Thru traffic will be rerouted via Allen Road, Toilsome Avenue, Grumman Avenue and Bayne Street. Detour signs will be in place to assist motorists, and local traffic will have access on either side of the bridge closure. The detour will be in effect until the end of May 2011.
The detour is part of ongoing work on a $4.7 million project to replace certain portions and rehabilitate other portions of the bridge. The contractor, New England Road, Inc. of Clinton, is preparing for the demolition phase of the project.
Thru traffic will be rerouted via Allen Road, Toilsome Avenue, Grumman Avenue and Bayne Street. Detour signs will be in place to assist motorists, and local traffic will have access on either side of the bridge closure. The detour will be in effect until the end of May 2011.